
STMicroelectronics
A form-fit compatible ultrafast diode with similar performance; verify reverse recovery time for your application.
ES1B is a 100V, 1A ultra-fast recovery rectifier in an SMA package, valued for its 15ns recovery time in high-efficiency applications. Finding a substitute requires closely matching this key switching speed.
Switching speed (trr) is the main concern. Other parameters like Vf and IR should also be checked.
Multiple candidates are available in the same SMA (DO-214AC) package.
Direct replacement for ES1B should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
STTH102A offers the closest parametric match and is the recommended starting point for evaluation.
The primary risk is a mismatch in switching speed (reverse recovery time), which can degrade circuit efficiency or cause failure.

STMicroelectronics
A form-fit compatible ultrafast diode with similar performance; verify reverse recovery time for your application.
| Feature / factor | ES1B | STTH102A | ES1G | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SMA (DO-214AC) | SMA (DO-214AC) | DO-214AC (SMA) | SMA (DO-214AC) / DO-214AC (SMA) — Package is a form-fit match.; ES1G: Same package ensures form and fit. | |
| Voltage | 100V | 200V | 400V | 200V / 400V — Higher voltage rating provides more design margin.; ES1G: Higher voltage rating provides increased design margin. | |
| Current | 1.0A | 1.0A | 1A | 1.0A / 1A — Average forward current matches the target.; ES1G: Identical average forward current. | |
| Speed | 15ns | 20ns | - | 20ns — Slightly slower reverse recovery time requires validation. | |
| Application | Fast Recovery | - | Fast Recovery | Fast Recovery — Diode type matches, ensuring similar switching behavior (trr ~35ns). | |
| Pinout | 2-pin | - | 2-pin | 2-pin — Pinout is assumed identical for a 2-pin diode in the same package family. |
Verified drop-in options for ES1B are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.