Precios

Managed manufacturing

Get a quote

From design to production. Built with confidence.

We don't just quote your board. We help you prepare it for production.

We don't just quote your board. We help you prepare it for production.

Design not ready for the line?

Clearances, footprints, and whether the BOM looks buyable. A starting list of risks, not a release.

Not sure the BOM can be bought?

A build quote that already knows whether the parts on this design are available.

Need the bare board?

The bare board, quoted from the design rather than a stackup guessed after the fact.

Need it assembled?

Assembly on the BOM you already have, including the lines that were hard to buy.

Who checks the AI list?

A person reviews the flags against this design and this BOM before they count as findings.

Who releases the build?

The factory's own engineering confirmation, after the files and the BOM are ready for the line.

An AI risk report does not replace the engineer review, and it does not replace the factory’s engineering confirmation.

From the files to a board you can ship.

PCB, assembly, a pre-check, and a quote that already knows whether the BOM can be bought.

PCB Fabrication

The bare board, quoted from the design rather than a stackup guessed after the fact.

PCBA Assembly

Assembly on the BOM you already have, including the lines that were hard to buy.

AI DFM & Readiness

The pre-check: manufacturability and the gaps an engineer still has to review.

Supply-Aware Manufacturing

A build quote that already knows whether the BOM can be bought.

From design files to delivered boards.

Upload files, review DFM, compare PCB or PCBA quotes, and place an order in the same workspace. Follow delivery after engineering and factory review.

app.partgenie.ai/app/projects/tinytapeout
ProjectsTinyTapeout Demo v0p9p4
ShareRequest quote
OverviewDesignBOMLibraryFindingsReleasesBuildSourcing
Project filesUpload files to prepare the buildKeep Gerber, BOM, and pick-and-place files in one project.
Drop files here, or choose filesGerber ZIP · XLSX · CSVChoose files
Files for this project
tinytapeout-gerber.zip
tinytapeout-bom.xlsx
tinytapeout-cpl.csv

DFM analysis continues here after import.

A build you can follow.

The pre-check, the review, and the factory confirmation stay on the same job, from quote to delivery.

AI

DFM pre-check

Clearances, footprints, and whether the BOM looks buyable. A starting list, not a release.

1

Shared BOM

Fabrication and assembly use the same BOM already used for sourcing.

Review

Engineer checks the flags

A person reviews the AI list against this design before it counts as a finding.

Release

Factory confirms the build

Production starts after the factory's own engineering confirmation.

Peter LiuJason Ke

Dedicated program manager

Every quote is assigned to one person, from the files through delivery.

Contact us

What a build should be able to show.

The DFM

What was caught before the files went to the line.

The build

Boards that left the line, not a quote that stopped at email.

Quality and delivery

What passed, and when it shipped.

A person responsible

One program manager stays on the quote, the build, and the shipment.

Questions before you buy.

View help center

Upload your manufacturing files and get a build quote

ZIP, RAR, or 7Z. Up to 50 MB.