
FH (Guangdong Fenghua Advanced Tech)
An upgrade from the same manufacturer with a higher voltage rating (3kV) and matching core specs.
The Fenghua 1808B102K202NT is a high-voltage 1nF 2kV MLCC in an 1808 package. This page provides verified alternatives, including direct crosses and voltage upgrades, to assist in sourcing and design.
Low if key parameters (Voltage, Capacitance, Dielectric) are matched or upgraded.
The 1808 package is standardized, minimizing physical incompatibility issues.
Direct replacement for 1808B102K202NT should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Upgrade to a higher voltage part from the same series, like 1808B102K302NT, or use a cross-vendor equivalent like FV42X102K202EEG after datasheet review.
The main risk is using a part with a lower voltage rating or a different dielectric (e.g., C0G instead of X7R), which can lead to component failure or circuit malfunction.

FH (Guangdong Fenghua Advanced Tech)
An upgrade from the same manufacturer with a higher voltage rating (3kV) and matching core specs.
| Feature / factor | 1808B102K202NT | 1808B102K302NT | 1808B102K502NT | FV42X102K202EEG | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 1808 | 1808 | 1808 | 1808 | 1808 — matched; 1808B102K502NT: matched; FV42X102K202EEG: Package size matches.; FV42X102K302EFG: matched |
| Voltage | 2kV | 3kV | 5kV | 2kV | 3kV / 5kV / 2kV — Higher voltage rating is a safe upgrade.; 1808B102K502NT: Significantly higher voltage rating.; FV42X102K202EEG: matched; FV42X102K302EFG: Higher voltage rating is a safe upgrade. |
| Capacitance | 1nF | 1nF | 1nF | 1nF | 1nF — matched; 1808B102K502NT: matched; FV42X102K202EEG: matched; FV42X102K302EFG: matched |
| Dielectric | X7R | X7R | - | X7R | X7R — matched; FV42X102K202EEG: Temperature characteristic matches.; FV42X102K302EFG: matched |
| Tolerance | ±10% | - | - | ±10% | ±10% — matched |
Verified drop-in options for 1808B102K202NT are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.