
onsemi
A very common alternative with identical package and primary ratings, but higher capacitance requires review.
The 1N4448 is a popular high-speed switching diode in a DO-35 package. Common alternatives like the 1N4148 exist, but require checking key parameters like capacitance for specific applications.
Key ratings match, but higher capacitance in alternatives requires review for high-speed applications.
Strong candidates share the same DO-35 axial package, ensuring form-fit compatibility.
The target and its primary alternatives are widely available, multi-sourced components.
Direct replacement for 1N4448 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Use 1N4148TA as a starting point, as it is the most common cross-reference, but verify capacitance.
The main risk is performance degradation in high-frequency circuits due to higher junction capacitance in common alternatives.

onsemi
A very common alternative with identical package and primary ratings, but higher capacitance requires review.
| Feature / factor | 1N4448 | 1N4148TA | 1N914BTR | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | DO-204AH (DO-35) | DO-204AH (DO-35) | DO-204AH (DO-35) | DO-204AH (DO-35) — Same axial package.; 1N914BTR: Same axial package. | |
| Voltage | 100V | 100V | 100V | 100V — Reverse voltage matches.; 1N914BTR: Reverse voltage matches. | |
| Current | 200mA | 200mA | 200mA | 200mA — Average forward current matches.; 1N914BTR: Average forward current matches. | |
| Speed | 4ns | 4ns | 4ns | 4ns — Reverse recovery time (trr) matches.; 1N914BTR: Reverse recovery time (trr) matches. | |
| Capacitance | 2.0pF | 4.0pF | 4.0pF | 4.0pF — Higher capacitance may affect high-frequency performance.; 1N914BTR: Higher capacitance may affect high-frequency performance. |
Verified drop-in options for 1N4448 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.