Best Alternatives to 1SS184

Package: SOT-23Shenzhen SLKOR Micro Semicon Co., Ltd.Diodes - Rectifiers - SingleDiode Type: SwitchingVoltage - DC Reverse (Vr) (Max): 80 VCurrent - Average Rectified (Io): 100 mAForward Voltage (Vf) (Max) @ If: 1.2 V @ 100 mAReverse Recovery Time (trr): 1.6 ns (Typ)

Find the best replacements for the 1SS184, a fast 80V switching diode in a SOT-23 package. This guide analyzes pin-compatible alternatives and highlights key parametric differences.

AI replacement insight

Electrical riskmedium

Switching speed (trr) is critical and hard to match exactly.

Package risklow

SOT-23 is a common package with standard pinouts.

Can it be replaced directly?

Direct replacement for 1SS184 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.

Best replacement path

BAS16LT1G is the most promising path, being a close parametric match.

Main risk

Switching speed mismatch. The target's 4ns reverse recovery time is a key performance metric that many alternatives fail to match.

Recommended alternatives

2
BAS16LT1G package
BAS16LT1G

onsemi

Needs validationlow risk

Strong alternative with matching package, pinout, and very similar electricals.

View details

Alternative comparison matrix

Feature / factor1SS184BAS16LT1GMMBD1501AAlt 3Compatibility / risk
PackageSOT-23SOT-23SOT-23SOT-23 — Package matches.; MMBD1501A: Package and pinout match.
Voltage80V100V200V100V / 200V — Higher voltage rating provides more margin.; MMBD1501A: Higher voltage rating.
Current100mA200mA200mA200mA — Higher current rating.; MMBD1501A: Higher current rating.
Trr4ns6nsNot Specified6ns / Not Specified — Reverse recovery time is very close to target.; MMBD1501A: Critical switching speed is missing.
Capacitance3pF2pF-2pF — Lower capacitance is generally better.

Application & sourcing insights

Questions & answers

Verified drop-in options for 1SS184 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.