
CJT (Changjiang Connectors)
A 5-pin, 1.0mm pitch vertical SMT header with a higher current rating. Mechanical verification is required.
BM05B-SRSS-TBT(LF)(SN) is a 5-pin, 1.0mm pitch vertical SMT header from JST's SR series. Finding a direct drop-in replacement requires careful verification of mechanical dimensions and mating compatibility.
Footprint and shroud dimensions are unlikely to match the JST SR series.
Candidates have matching or better voltage/current ratings.
Direct replacement for BM05B-SRSS-TBT(LF)(SN) should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Parametrically similar connectors exist, but no direct cross has been found. The best path is to evaluate candidates like WAFER-SH1.0-5PLB for a potential board redesign or if mechanical tolerances allow.
Mechanical Mismatch

CJT (Changjiang Connectors)
A 5-pin, 1.0mm pitch vertical SMT header with a higher current rating. Mechanical verification is required.
| Feature / factor | BM05B-SRSS-TBT(LF)(SN) | A1002WV-S-5P | WAFER-SH1.0-5PLB | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Pitch | 1.0mm | 1.0mm | 1.0mm | 1.0mm — Pitch matches.; WAFER-SH1.0-5PLB: Pitch matches. | |
| Pin Count | 5 | 5 | 5 | 5 — Pin count matches.; WAFER-SH1.0-5PLB: Pin count matches. | |
| Orientation | Vertical | Vertical | Vertical | Vertical — Mounting orientation matches.; WAFER-SH1.0-5PLB: Mounting orientation matches. | |
| Current | 0.7A | 1A | 1A | 1A — Candidate has a higher current rating.; WAFER-SH1.0-5PLB: Candidate has a higher current rating. | |
| Package | JST SR Series | A1002 Series | SH Series | A1002 Series / SH Series — Different connector series (A1002 vs SR), mechanical fit not guaranteed.; WAFER-SH1.0-5PLB: Different connector series (SH vs SR), mechanical fit not guaranteed. |
Verified drop-in options for BM05B-SRSS-TBT(LF)(SN) are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.