
Yageo
This Yageo capacitor is an excellent upgrade with a higher 50V rating in the same 0201 package.
Yageo's CC0201JRNPO8BN100 is a general-purpose 10pF, 25V, 0201 MLCC capacitor with a stable NP0 dielectric, widely used in filtering, decoupling, and timing applications.
Low if capacitance, tolerance, and dielectric match. Higher voltage is a safe upgrade.
The 0201 package is standardized, minimizing physical compatibility issues.
This is a high-volume, multi-source commodity component.
Direct replacement for CC0201JRNPO8BN100 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Upgrade to Yageo CC0201JRNPO9BN100 for a higher voltage rating or use Murata GRM0335C1E100JA01D as a direct cross-vendor alternative.
The primary risk when substituting is selecting a part with a different capacitance value, which can alter circuit behavior.

Yageo
This Yageo capacitor is an excellent upgrade with a higher 50V rating in the same 0201 package.
| Feature / factor | CC0201JRNPO8BN100 | CC0201JRNPO9BN100 | GRM0335C1E100JA01D | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 metric) — Form factor matches.; GRM0335C1E100JA01D: Form factor matches. | |
| Capacitance | 10 pF | 10 pF | 10 pF | 10 pF — Capacitance matches.; GRM0335C1E100JA01D: Capacitance matches. | |
| Voltage | 25 V | 50 V | 25 V | 50 V / 25 V — Higher voltage rating provides increased design margin.; GRM0335C1E100JA01D: Voltage rating matches. | |
| Dielectric | NP0 (C0G) | NP0 (C0G) | C0G | NP0 (C0G) — Stable dielectric material matches.; GRM0335C1E100JA01D: C0G and NP0 are equivalent industry terms for the same dielectric. | |
| Tolerance | ±5% | ±5% | ±5% | ±5% — Tolerance matches.; GRM0335C1E100JA01D: Tolerance matches. |
Verified drop-in options for CC0201JRNPO8BN100 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.