
Murata Electronics
Pin-compatible MLCC with identical key specs from a different manufacturer.
Yageo's CC0201KRX7R9BB221 is a general-purpose 220pF, 50V, 10% X7R MLCC in an 0201 package. Alternatives exist with identical specs, different packages, or upgraded performance.
Many functional alternatives exist in different packages (0402, 0603) that require board redesign.
If specs and dielectric match, electrical risk is low. A change in dielectric (e.g., to C0G) requires engineering review.
This is a common capacitor value with many suppliers, reducing sourcing risk.
Direct replacement for CC0201KRX7R9BB221 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
For a drop-in replacement, select a cross-vendor part with an identical 0201 package and key specs, like Murata's GRM033R71H221KA12D.
The primary risk when substituting is using a part with a different package size, which requires a new PCB layout and is not a drop-in replacement.

Murata Electronics
Pin-compatible MLCC with identical key specs from a different manufacturer.
| Feature / factor | CC0201KRX7R9BB221 | GRM033R71H221KA12D | GRM0335C1H221FA01D | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 metric) — Identical package and land pattern.; GRM0335C1H221FA01D: Package matches. | |
| Capacitance | 220 pF | 220 pF | - | 220 pF — Capacitance matches. | |
| Voltage | 50 V | 50 V | 50 V | 50 V — Voltage rating matches.; GRM0335C1H221FA01D: Voltage rating matches. | |
| Dielectric | X7R | X7R | C0G | X7R / C0G — Dielectric type matches.; GRM0335C1H221FA01D: C0G is more stable than X7R. | |
| Tolerance | ±10% | ±10% | ±1% | ±10% / ±1% — Tolerance matches.; GRM0335C1H221FA01D: Tighter tolerance is an upgrade. |
Verified drop-in options for CC0201KRX7R9BB221 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.