
Yageo
A potential pin-compatible substitute with very similar capacitance but wider tolerance.
Find and compare replacements for the Yageo CC0603BRNPO9BN2R4, a 2.4pF 50V 0603 MLCC. This guide analyzes pin-compatible and parametric alternatives.
Capacitance and tolerance differences require circuit analysis.
Candidates share the same 0603 package.
These are common MLCC values from a major manufacturer.
Direct replacement for CC0603BRNPO9BN2R4 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The best path is to use a part with the same package, voltage, and dielectric, and very similar capacitance, like CC0603CRNPO9BN2R5, but check tolerance.
The main risk is substituting with a part that has a different capacitance or a wider tolerance, which can affect timing, filtering, or impedance matching.

Yageo
A potential pin-compatible substitute with very similar capacitance but wider tolerance.
| Feature / factor | CC0603BRNPO9BN2R4 | CC0603CRNPO9BN2R5 | CC0603CRNPO9BN2R7 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0603 (1608 metric) | 0603 (1608 metric) | 0603 (1608 metric) | 0603 (1608 metric) — Identical package ensures form and fit.; CC0603CRNPO9BN2R7: Identical package ensures form and fit. | |
| Voltage | 50V | 50V | 50V | 50V — Voltage rating matches.; CC0603CRNPO9BN2R7: Voltage rating matches. | |
| Capacitance | 2.4pF | 2.5pF | 2.7pF | 2.5pF / 2.7pF — Very close capacitance value.; CC0603CRNPO9BN2R7: Capacitance is ~12.5% higher. | |
| Tolerance | ±0.1pF | ±0.25pF | ±0.25pF | ±0.25pF — Wider tolerance may impact precision circuits.; CC0603CRNPO9BN2R7: Wider tolerance may impact precision circuits. | |
| Dielectric | NP0 (C0G) | NP0 (C0G) | - | NP0 (C0G) — Dielectric material matches, ensuring similar temperature characteristics. |
Verified drop-in options for CC0603BRNPO9BN2R4 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.