
Murata Electronics
Parametrically identical substitute, but its NRND lifecycle status poses a sourcing risk for new designs.
CC0603JRNPO9BN111 is a standard 110pF, 50V, 0603 NP0/C0G ceramic capacitor from Yageo. Finding a substitute requires matching capacitance, voltage, and package size, with special attention to lifecycle status.
Alternatives may have slightly different capacitance, requiring circuit validation.
All viable candidates share the same 0603 package.
The best parametric match is NRND, posing a long-term supply chain risk.
Direct replacement for CC0603JRNPO9BN111 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
For repair, GRM1885C1H111JA01D is a strong match. For new designs, CC0603JRNPOABN101 is a potential alternative if the circuit tolerates a 9% lower capacitance.
The primary risk is either sourcing (for the NRND part) or functional impact from capacitance mismatch (for active alternatives).

Murata Electronics
Parametrically identical substitute, but its NRND lifecycle status poses a sourcing risk for new designs.
| Feature / factor | CC0603JRNPO9BN111 | GRM1885C1H111JA01D | CC0603JRNPOABN101 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0603 (1608 metric) | 0603 (1608 metric) | 0603 (1608 metric) | 0603 (1608 metric) — Form and fit match.; CC0603JRNPOABN101: Form and fit match. | |
| Capacitance | 110 pF | 110 pF | 100 pF | 110 pF / 100 pF — Capacitance is identical.; CC0603JRNPOABN101: Capacitance is ~9% lower. | |
| Voltage | 50 V | 50 V | 200 V | 50 V / 200 V — Voltage rating is identical.; CC0603JRNPOABN101: Higher voltage rating provides more margin. | |
| Tolerance | ±5% | ±5% | - | ±5% — Tolerance is identical. | |
| Lifecycle | Active | NRND | Active | NRND / Active — Candidate is not recommended for new designs.; CC0603JRNPOABN101: Both parts are active. |
Verified drop-in options for CC0603JRNPO9BN111 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.