
FH (Guangdong Fenghua Advanced Tech)
A cross-vendor alternative from FH in the same 0805 package with matching capacitance, voltage, and dielectric.
Yageo's CC0805CRNPO9BN2R2 is a standard 2.2pF, 50V, C0G/NP0 ceramic capacitor in an 0805 package. This page provides verified substitutes and functional alternatives to help with sourcing and design.
Key electrical parameters are well-matched by top candidates.
High risk if selecting an alternative not in an 0805 package; requires PCB redesign.
This is a common capacitor value with many available manufacturers.
Direct replacement for CC0805CRNPO9BN2R2 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Start with Datasheet verified or Strong match candidates for CC0805CRNPO9BN2R2, then review parametric alternatives for package and electrical fit.
The main risk is using a part with a different package size, which requires a PCB layout change.

FH (Guangdong Fenghua Advanced Tech)
A cross-vendor alternative from FH in the same 0805 package with matching capacitance, voltage, and dielectric.
| Feature / factor | CC0805CRNPO9BN2R2 | 0805CG2R2C500NT | FCC0603N2R2C500CT | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0805 (2012 metric) | 0805 | 0603 (1608 Metric) | 0805 / 0603 (1608 Metric) — Package size matches.; FCC0603N2R2C500CT: Smaller package requires PCB layout change. | |
| Capacitance | 2.2 pF | 2.2 pF | 2.2 pF | 2.2 pF — Capacitance matches.; FCC0603N2R2C500CT: Capacitance matches. | |
| Voltage | 50 V | 50 V | 50 V | 50 V — Voltage rating matches.; FCC0603N2R2C500CT: Voltage rating matches. | |
| Dielectric | NP0 (C0G) | C0G | C0G (NP0) | C0G / C0G (NP0) — Dielectric type matches.; FCC0603N2R2C500CT: Dielectric type matches. | |
| Tolerance | ±0.25 pF | ±0.25 pF | - | ±0.25 pF — Tolerance matches. |
Verified drop-in options for CC0805CRNPO9BN2R2 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.