
AISHI
Matches key electricals and package, but has lower endurance. Review lifetime and ripple current needs.
Finding a substitute for the NCC EKXJ251ELL101ML20S, a 100µF 250V long-life aluminum electrolytic capacitor, requires careful comparison of physical dimensions, voltage rating, and endurance. This guide reviews several potential alternatives.
Several candidates are physically larger and will not fit the target footprint.
Most alternatives have much lower endurance (lifetime), which is a critical parameter.
Direct replacement for EKXJ251ELL101ML20S should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The AISHI EGS2EM101L20C30T offers the most direct path, but requires accepting a lower endurance rating.
The primary risk is reduced product reliability due to candidates having significantly lower endurance ratings than the 10,000-hour target part.

AISHI
Matches key electricals and package, but has lower endurance. Review lifetime and ripple current needs.
| Feature / factor | EKXJ251ELL101ML20S | EGS2EM101L20C30T | 400CXW100MEFR16X31.5 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | Radial, 16mm x 20mm | Radial, 16mm x 20mm | 16mm x 31.5mm | Radial, 16mm x 20mm / 16mm x 31.5mm — Package dimensions match.; 400CXW100MEFR16X31.5: Taller than target. | |
| Voltage | 250V | 250V | 400V | 250V / 400V — Voltage rating matches.; 400CXW100MEFR16X31.5: Higher voltage rating is a safe upgrade. | |
| Capacitance | 100µF | 100µF | - | 100µF — Capacitance matches. | |
| Endurance | 10000 hours | 6000 hours | 5000 hours | 6000 hours / 5000 hours — Candidate has lower endurance.; 400CXW100MEFR16X31.5: Candidate has lower endurance. | |
| Ripple Current | 635mA @ 120Hz | 780mA @ 100kHz | - | 780mA @ 100kHz — Specified at different frequency. |
Verified drop-in options for EKXJ251ELL101ML20S are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.