
ZHIDE
Strong alternative in the same package with matched voltage and recovery time, and higher current rating.
ES1J-LTP is a 1A, 600V super-fast recovery rectifier in a common SMA package. This page reviews potential alternatives, focusing on critical parameters like recovery time, voltage, and current.
Reverse recovery time (trr) is a critical parameter that must be matched or improved.
The DO-214AC (SMA) package is standardized, but land pattern verification is always wise.
ES3JA appears to be a strong functional match, but pin-to-pin compatibility and thermal performance should be verified before production.
ES3JA is the strongest candidate, matching key electricals and package. Alternatives with slower recovery times like ES2M exist but require careful review.
The main risk is substituting with a diode that has a slower reverse recovery time (trr), which can cause failures in high-frequency switching circuits.

ZHIDE
Strong alternative in the same package with matched voltage and recovery time, and higher current rating.
| Feature / factor | ES1J-LTP | ES3JA | ES2M | US2M | Compatibility / risk |
|---|---|---|---|---|---|
| Package | DO-214AC (SMA) | DO-214AC (SMA) | DO-214AC (SMA) | DO-214AC (SMA) | DO-214AC (SMA) — Same package and pin count.; ES2M: Same package and pin count.; US2M: Same package and pin count. |
| Voltage | 600V | 600V | 1000V | 1000V | 600V / 1000V — Voltage rating matches target.; ES2M: Higher voltage rating provides more margin.; US2M: Higher voltage rating provides more margin. |
| Current | 1A | 3A | 2A | 2A | 3A / 2A — Higher current rating provides more margin.; ES2M: Higher current rating.; US2M: Higher current rating. |
| Recovery Time | 35ns | 35ns | 75ns | 75ns | 35ns / 75ns — Reverse recovery time matches target's key spec.; ES2M: Slower recovery time may not be suitable for all applications.; US2M: Slower recovery time may not be suitable for all applications. |
Verified drop-in options for ES1J-LTP are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.