
Yageo
Pin-compatible 0402 resistor with a very close resistance of 280kΩ and matching power, tolerance, and TCR.
Find substitutes for the FRC0402F2873TS, a 287kΩ 1% 0.0625W 0402 thick film resistor. Alternatives from Yageo, Panasonic, and UNI-ROYAL are available with similar or improved specifications.
Resistance changes are small (<5%), and power ratings are equal or better.
All recommended candidates are in the standard 0402 package.
Multiple vendors offer suitable alternatives, reducing supply chain risk.
Direct replacement for FRC0402F2873TS should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Upgrade to a higher power rating with Panasonic ERJ2RKF3003X or select a close resistance match like Yageo RC0402FR-07280KL.
Slight resistance value deviation from the original 287kΩ.

Yageo
Pin-compatible 0402 resistor with a very close resistance of 280kΩ and matching power, tolerance, and TCR.
| Feature / factor | FRC0402F2873TS | RC0402FR-07280KL | ERJ2RKF3003X | RC0402FR-07274KL | Compatibility / risk |
|---|---|---|---|---|---|
| Resistance | 287kΩ | 280kΩ | 300kΩ | 274kΩ | 280kΩ / 300kΩ / 274kΩ / 301kΩ — -2.4% deviation, within E12 series value.; ERJ2RKF3003X: +4.5% deviation.; RC0402FR-07274KL: -4.5% deviation.; RC0402FR-07301KL: +4.9% deviation. |
| Tolerance | ±1% | ±1% | ±1% | ±1% | ±1% — matched; ERJ2RKF3003X: matched; RC0402FR-07274KL: matched; RC0402FR-07301KL: matched |
| Power | 0.0625W | 0.0625W | 0.1W | 0.0625W | 0.0625W / 0.1W — matched; ERJ2RKF3003X: Higher power rating provides more design margin.; RC0402FR-07274KL: matched; RC0402FR-07301KL: matched |
| Tcr | ±100 ppm/°C | ±100 ppm/°C | ±100 ppm/°C | - | ±100 ppm/°C — matched; ERJ2RKF3003X: matched |
| Package | 0402 | 0402 | 0402 | 0402 | 0402 — matched; ERJ2RKF3003X: matched; RC0402FR-07274KL: matched; RC0402FR-07301KL: matched |
Verified drop-in options for FRC0402F2873TS are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.