Best Alternatives to FRC0805F6801TS

Package: 0805FOJANChip Resistor - Surface MountResistance: 6.8 kΩTolerance: ±1%Power Rating: 0.125 WPackage / Case: 0805 (2012 Metric)Max Working Voltage: 150 V

Find reliable substitutes for the FRC0805F6801TS, a 6.8kΩ 1% 1/8W 0805 chip resistor. This guide reviews pin-compatible alternatives and parametric options, highlighting key differences to ensure design success.

AI replacement insight

Electrical risklow

Key electrical parameters are common and easily matched.

Package risklow

0805 is a standard package, but verifying landing patterns is best practice.

Sourcing risklow

This is a high-volume commodity component with many suppliers.

Can it be replaced directly?

Direct replacement for FRC0805F6801TS should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.

Best replacement path

Start with Datasheet verified or Strong match candidates for FRC0805F6801TS, then review parametric alternatives for package and electrical fit.

Main risk

The main risk is physical footprint variance between manufacturers, even for the same 0805 package. Always verify the datasheet landing pattern.

Recommended alternatives

2
RC0805FR-076K8L package
Needs validationlow risk

Yageo RC0805FR-076K8L is a strong alternative with matching package, resistance, tolerance, and power rating.

View details

Alternative comparison matrix

Feature / factorFRC0805F6801TSRC0805FR-076K8L0805W8F6801T5EAlt 3Compatibility / risk
Package08050805-0805 — Matches target package size.
Resistance6.8kΩ6.8kΩ-6.8kΩ — Identical resistance value.
Power0.125W0.125W-0.125W — Matches power rating.
Tolerance±1%±1%-±1% — Matches precision.
Tcr±100 ppm/°C±100 ppm/°C-Not specified — TCR must be verified from datasheet.

Application & sourcing insights

Questions & answers

Verified drop-in options for FRC0805F6801TS are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.