Best Alternatives to FSMD050-30-R

Package: 1812FUZETECCircuit ProtectionOperating Voltage (Max): 30VHold Current: 500mATrip Current: 1AMax Current: 100ATypical Power: 0.8W

FSMD050-30-R is a 0.5A, 30V PTC resettable fuse in an 1812 package. We've identified potential alternatives, including a strong match from TECHFUSE, for your review.

AI replacement insight

Electrical risklow

Low for mSMD050-33V, which matches key specs. High for others due to current mismatch.

Package risklow

All candidates share the same 1812 package, ensuring physical compatibility.

Can it be replaced directly?

Direct replacement for FSMD050-30-R should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.

Best replacement path

The most promising path is mSMD050-33V, which matches key parameters. Other options have higher hold currents and pose a risk to the protected circuit.

Main risk

The main risk is selecting a part with a higher hold current, which would compromise the intended overcurrent protection of the circuit.

Recommended alternatives

2
mSMD050-33V package
mSMD050-33V

TECHFUSE

Needs validationlow risk

A PTC fuse from TECHFUSE in the same 1812 package with identical hold/trip currents and a higher voltage rating.

View details

Alternative comparison matrix

Feature / factorFSMD050-30-RmSMD050-33VSMD1812-075C-33VAlt 3Compatibility / risk
Package1812181218121812 — Same package ensures form and fit.; SMD1812-075C-33V: Same package ensures form and fit.
Current1.0A1.0A1.5A1.0A / 1.5A — Trip current matches target.; SMD1812-075C-33V: Higher trip current alters protection profile.
Voltage30.0V33.0V33.0V33.0V — Higher voltage rating provides more safety margin.; SMD1812-075C-33V: Higher voltage rating provides more safety margin.

Application & sourcing insights

Questions & answers

Verified drop-in options for FSMD050-30-R are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.