
Yageo
A direct cross-vendor alternative with identical key parameters and package.
Find alternatives for the Murata GRM0335C1E100JA01D, a 10pF 25V 0201 C0G capacitor. This page analyzes pin-compatible, upgrade, and parametric alternatives from Yageo and Murata.
For direct crosses, risk is low. Parametric alternatives require analysis.
All suggested alternatives use the same standard 0201 package.
Adding cross-vendor options improves supply chain resilience.
Direct replacement for GRM0335C1E100JA01D should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Use Yageo CC0201JRNPO8BN100 for a direct cross or CC0201JRNPO9BN100 for a voltage upgrade.
The main risk is using a part with incorrect capacitance, which can affect circuit timing or filtering performance.

Yageo
A direct cross-vendor alternative with identical key parameters and package.
| Feature / factor | GRM0335C1E100JA01D | CC0201JRNPO8BN100 | CC0201JRNPO9BN100 | GRM0335C1H9R1BA01D | Compatibility / risk |
|---|---|---|---|---|---|
| Voltage | 25V | 25V | 50V | 50V | 25V / 50V — matched; CC0201JRNPO9BN100: Candidate has higher voltage rating.; GRM0335C1H9R1BA01D: Candidate has higher voltage rating. |
| Capacitance | 10pF | 10pF | 10pF | 9.1pF | 10pF / 9.1pF — matched; CC0201JRNPO9BN100: matched; GRM0335C1H9R1BA01D: Candidate capacitance is 9% lower. |
| Dielectric | C0G | NP0 (C0G) | NP0 (C0G) | - | NP0 (C0G) — NP0 and C0G are equivalent dielectrics.; CC0201JRNPO9BN100: NP0 and C0G are equivalent dielectrics. |
| Package | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 metric) | 0201 (0603 Metric) | 0201 (0603 metric) / 0201 (0603 Metric) — matched; CC0201JRNPO9BN100: matched; GRM0335C1H9R1BA01D: matched |
| Tolerance | ±5% | ±5% | ±5% | ±0.1pF | ±5% / ±0.1pF — matched; CC0201JRNPO9BN100: matched; GRM0335C1H9R1BA01D: Tighter tolerance than target's ±0.5pF. |
Verified drop-in options for GRM0335C1E100JA01D are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.