
HONOR
An upgrade path from the same manufacturer with a higher voltage rating (25V) and equal or better endurance.
GVT1C331M0607 is a 330uF, 16V surface-mount aluminum electrolytic capacitor in a 6.3mm x 7.7mm package. Several alternatives exist, including pin-compatible options and upgrades for general-purpose applications.
Low if key parameters are matched. Check ESR for sensitive circuits.
The 6.3x7.7mm package is standard and should fit.
Multiple vendors produce similar parts, indicating good availability.
Direct replacement for GVT1C331M0607 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Use GVT1C337M0608CNVC for a direct replacement or GVM1E331M0607 for a voltage upgrade.
The main risk is selecting a part with incorrect capacitance. For high-frequency or high-ripple applications, ESR and ripple current ratings should also be compared.

HONOR
An upgrade path from the same manufacturer with a higher voltage rating (25V) and equal or better endurance.
| Feature / factor | GVT1C331M0607 | GVM1E331M0607 | GVT1C337M0608CNVC | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 6.3mm x 7.7mm | 6.3 mm x 7.7 mm | 6.3mm x 7.7mm | 6.3 mm x 7.7 mm / 6.3mm x 7.7mm — Identical package dimensions.; GVT1C337M0608CNVC: Identical package dimensions. | |
| Capacitance | 330uF | 330uF | 330uF | 330uF — Capacitance matches.; GVT1C337M0608CNVC: Capacitance matches. | |
| Voltage | 16V | 25V | 16V | 25V / 16V — Higher voltage rating is a safe upgrade.; GVT1C337M0608CNVC: Voltage rating matches. | |
| Endurance | 2000 hours at 105°C | 2000-5000 hours @ 105°C | 2000 Hrs @ 105°C | 2000-5000 hours @ 105°C / 2000 Hrs @ 105°C — Endurance is equal or better.; GVT1C337M0608CNVC: Endurance rating matches. | |
| Tolerance | ±20% | - | ±20% | ±20% — Tolerance matches. |
Verified drop-in options for GVT1C331M0607 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.