
AISHI
Matches all key specs and package, with a longer lifetime. A strong candidate for direct replacement.
Finding a substitute for the CX KM108M016G13RR0VH2FP0, a 1000µF 16V radial capacitor, involves matching key electricals and package size. Several alternatives exist with similar or upgraded performance.
Several candidates match or exceed voltage and capacitance ratings.
Candidates vary in size and mounting type (Radial vs. SMD), requiring careful verification.
Yes, the AISHI ERE1CM102G13OT is a potential pin-to-pin replacement for the KM108M016G13RR0VH2FP0, offering identical core specs and package with a longer lifetime. However, datasheet review is recommended.
The AISHI ERE1CM102G13OT is the strongest candidate, matching all key parameters and package size, with an improved lifetime.
The main risks involve package mismatches in size or mounting type (radial vs. SMD) and technology differences (wet vs. solid polymer electrolytic).

AISHI
Matches all key specs and package, with a longer lifetime. A strong candidate for direct replacement.
| Feature / factor | KM108M016G13RR0VH2FP0 | ERE1CM102G13OT | SPE1EM102G12OL | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | Radial, 10mm x 13mm | Radial, 10mm x 13mm | Radial, 10mm x 12mm | Radial, 10mm x 13mm / Radial, 10mm x 12mm — Identical package dimensions.; SPE1EM102G12OL: Slightly shorter (12mm vs 13mm). | |
| Voltage | 16.0V | 16.0V | 25.0V | 16.0V / 25.0V — Voltage rating matches.; SPE1EM102G12OL: Higher voltage rating is an upgrade. | |
| Capacitance | 1000µF | 1000µF | - | 1000µF — Capacitance matches. | |
| Lifetime | 2000h @ 105°C | 3000h @ 105°C | 5000h @ 105°C | 3000h @ 105°C / 5000h @ 105°C — Candidate has longer endurance.; SPE1EM102G12OL: Significantly longer endurance. | |
| Technology | Wet Electrolytic | - | Solid Polymer | Solid Polymer — Different dielectric may affect ESR/leakage. |
Verified drop-in options for KM108M016G13RR0VH2FP0 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.