
TECH PUBLIC
A strong alternative with matching package, bandwidth, and quiescent current; requires pinout verification.
The LMV321-TR is a popular low-power, general-purpose op-amp. Finding a replacement requires matching its 1MHz bandwidth and very low 40µA quiescent current in a SOT23-5 package.
Parametric differences are minor but should be reviewed for sensitive applications.
All strong candidates are in the same SOT23-5 package, but pinout must be confirmed.
Availability of alternative manufacturers may improve supply chain resilience.
Direct replacement for LMV321-TR should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
TPV321S5 appears to be a direct cross-reference part, making it the most promising replacement path, followed closely by TP8541ARTZ.
The primary risk is assuming pin-for-pin compatibility without verifying the datasheet, which could lead to circuit malfunction.

TECH PUBLIC
A strong alternative with matching package, bandwidth, and quiescent current; requires pinout verification.
| Feature / factor | LMV321-TR | TPV321S5 | TP8541ARTZ | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SOT23-5 | SOT23-5 | SOT23-5 | SOT23-5 — Package matches, pinout requires verification.; TP8541ARTZ: Package matches, pinout requires verification. | |
| Bandwidth | 1 MHz | 1 MHz | 1 MHz | 1 MHz — Gain-Bandwidth Product matches.; TP8541ARTZ: Gain-Bandwidth Product matches. | |
| Current | 40 µA | 40 µA | 55 µA | 40 µA / 55 µA — Quiescent current matches.; TP8541ARTZ: Slightly higher quiescent current. | |
| Voltage | 3.5 mV | 5 mV | 5 mV | 5 mV — Slightly higher offset voltage.; TP8541ARTZ: Slightly higher offset voltage. | |
| Slew Rate | 0.6 V/µs | Not listed | - | Not listed — Slew rate not found in key attributes, requires datasheet check. |
Verified drop-in options for LMV321-TR are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.