
Murata Electronics
A strong match with same package and inductance, plus a higher current rating. Review datasheet for series differences.
Finding a substitute for the Murata LQP03TN18NH02D 18nH inductor requires matching its 0201 package and electrical specs. This guide reviews alternatives, highlighting key differences in performance and physical size.
Alternatives exist, but inductance or series characteristics may differ.
Many functional alternatives are in larger packages (0402, 0603), requiring a new PCB layout.
Multiple alternatives from the same manufacturer are available.
Direct replacement for LQP03TN18NH02D should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The most promising path is evaluating LQP03HQ18NH02D, which matches form and key parameters.
The main risk is using a part with a different package size, which requires a board redesign, or a part with different inductance, which can detune RF circuits.

Murata Electronics
A strong match with same package and inductance, plus a higher current rating. Review datasheet for series differences.
| Feature / factor | LQP03TN18NH02D | LQP03HQ18NH02D | LQP03TN15NH02D | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0201 (0603 metric) | 0201 (0603 Metric) | 0201 (0603 metric) | 0201 (0603 Metric) / 0201 (0603 metric) — Identical package size.; LQP03TN15NH02D: Identical package size. | |
| Inductance | 18 nH | 18 nH | 15 nH | 18 nH / 15 nH — Inductance matches.; LQP03TN15NH02D: Inductance is 16.7% lower. | |
| Current | 200 mA | 250 mA | 250 mA | 250 mA — Higher current rating provides more margin.; LQP03TN15NH02D: Higher current rating. | |
| Dcr | 0.8 Ω | 0.8 Ω | 0.7 Ω | 0.8 Ω / 0.7 Ω — DC resistance is identical.; LQP03TN15NH02D: Lower DCR is better. | |
| Srf | 2200 MHz | 3000 MHz | - | 3000 MHz — Higher SRF is generally better. |
Verified drop-in options for LQP03TN18NH02D are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.