Best Alternatives to MRA4007T3G

Package: DO-214AC, SMAonsemiDiodes - Rectifiers - SinglePackage: Tape & Reel (TR); Cut Tape (CT); Digi-Reel®Voltage - DC Reverse (Vr) (Max): 1000 VCurrent - Average Rectified (Io): 1AVoltage - Forward (Vf) (Max) @ If: 1.1 V @ 1 ACurrent - Reverse Leakage @ Vr: 10 µA @ 1000 V

MRA4007T3G is a 1000V, 1A standard recovery rectifier in a surface-mount SMA package from onsemi. Finding a substitute requires matching the package, voltage, current, and standard recovery characteristics.

AI replacement insight

Electrical riskmedium

Recovery time mismatch is the main electrical risk.

Package risklow

SMA (DO-214AC) is a standard, widely available package.

Sourcing risklow

Many manufacturers produce similar 1000V, 1A SMA diodes.

Can it be replaced directly?

Direct replacement for MRA4007T3G should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.

Best replacement path

Use a general-purpose 1000V, 1A rectifier in an SMA package, such as the M7 or 1N4007(M7), after verifying standard recovery time from the datasheet.

Main risk

The primary risk is substituting a fast-recovery diode for the standard-recovery target, which can introduce unexpected EMI or circuit behavior.

Recommended alternatives

3
M7 package
M7

MDD

Needs validationlow risk

A likely pin-compatible 1000V, 1A general-purpose rectifier in the same SMA package.

View details

Alternative comparison matrix

Feature / factorMRA4007T3GM71N4007(M7)RS1MCompatibility / risk
PackageSMA (DO-214AC)DO-214AC, SMA--SMA (DO-214AC) — Package matches target.
Voltage1000.0V1000.0V--1000.0V — Voltage rating matches.
Current1.0A1.0A--1.0A — Current rating matches.
ApplicationStandard RecoveryGeneral Purpose (likely Standard)--Fast Recovery — Candidate is fast recovery, target is standard. May impact EMI.

Application & sourcing insights

Questions & answers

Verified drop-in options for MRA4007T3G are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.