Best Alternatives to NX7002AK,215

Package: SOT23 (TO-236AB)Nexperia USA Inc.FETsDrain-Source Voltage (VDS): 60 VContinuous Drain Current (ID): 190 mARDS(on) (Max): 4.5 ΩGate-Source Threshold Voltage (VGS(th)): 1.1 V to 2.1 VTotal Gate Charge (QG): 0.33 nC

The NX7002AK,215 is a 60V N-Channel Trench MOSFET in a SOT23 package, used for low-side load switching and driver applications. This page provides a detailed review of potential alternatives and their compatibility.

AI replacement insight

Electrical risklow

Most alternatives offer stronger or equivalent electrical specs.

Package risklow

SOT-23 is a standard package, but pinout verification is still required.

Sourcing risklow

The 2N7002 family is a multi-source, widely available part.

Can it be replaced directly?

Yes, several parts like the 2N7002 series and BSS138P are strong candidates for replacement, often with improved performance. Pinout and key electrical parameters must be verified.

Best replacement path

BSS138P,215 offers a clear upgrade path with better electrical characteristics in the same package.

Main risk

The primary risk is assuming pin-compatibility without verification, and overlooking differences in gate characteristics (Vgs(th), Qg) which can affect switching behavior.

Recommended alternatives

5
BSS138P,215 package
BSS138P,215

Nexperia USA Inc.

Needs validationlow risk

An excellent upgrade path with higher current and much lower on-resistance. Pinout verification is recommended.

View details

Alternative comparison matrix

Feature / factorNX7002AK,215BSS138P,215L2N7002SLLT1G2N7002BK,215Compatibility / risk
PackageSOT23 (TO-236AB)SOT23 (TO-236AB)--SOT23 (TO-236AB) — Package is form-factor compatible.
Voltage60.0 V60.0 V--60.0 V — Voltage rating matches the target.
Current0.19 A0.36 A--0.35 A — Higher current rating provides more margin.
Rds On4.5 Ω1.6 Ω--Missing — Rds(on) is a key parameter and must be checked.

Application & sourcing insights

Questions & answers

Verified drop-in options for NX7002AK,215 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.