
A 7-pin, 2.0mm pitch header from JST's PH series with matching electrical ratings; likely form-fit compatible.
The PH-7A is a common 7-pin, 2.0mm pitch single-row header for wire-to-board connections. While many alternatives exist, careful verification of mechanical dimensions is crucial for finding a successful drop-in replacement.
Many alternatives match or exceed the 100V/2A rating.
Requires datasheet review to confirm PCB footprint and mating compatibility.
The 2.0mm pitch 7-pin header is a common form factor with many suppliers.
Direct replacement for PH-7A should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Use a JST PH series connector like B7B-PH-K-S(LF)(SN), which matches all key electrical specs and is from the original manufacturer series.
The primary risk is mechanical incompatibility. Even with the same pin count and pitch, the plastic shroud dimensions, pin length, and PCB footprint can vary slightly between manufacturers.

A 7-pin, 2.0mm pitch header from JST's PH series with matching electrical ratings; likely form-fit compatible.
| Feature / factor | PH-7A | B7B-PH-K-S(LF)(SN) | ZX-HY2.0-7PZZ | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Pin Count | 7 | 7 | 7 | 7 — Number of positions match.; ZX-HY2.0-7PZZ: Number of positions match. | |
| Pitch | 2.00 mm | 2.0mm | 2.0mm | 2.0mm — Pin pitch matches.; ZX-HY2.0-7PZZ: Pin pitch matches. | |
| Package | Through Hole | Through Hole, Straight | - | Through Hole, Straight — Mounting type matches, but full mechanical dimensions require datasheet verification. | |
| Voltage | 100 V | 100V | 250V | 100V / 250V — Voltage rating matches.; ZX-HY2.0-7PZZ: Higher voltage rating provides more margin. | |
| Current | 2 A | 2A | 2A | 2A — Current rating matches.; ZX-HY2.0-7PZZ: Current rating matches. |
Verified drop-in options for PH-7A are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.