
MSKSEMI
A strong alternative with matching package, voltage, current, and fast recovery time. Requires datasheet review.
Find and compare replacements for the RS1ML, a 1000V, 1A fast recovery diode in a SOD-123FL package. This guide reviews alternatives based on key electrical and mechanical parameters.
Using a diode with incorrect recovery time (trr) or higher forward voltage (Vf) can cause circuit failure or overheating.
The SOD-123FL package is standardized, but minor dimensional differences between manufacturers should be checked.
Direct replacement for RS1ML should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The FR107 series from various manufacturers offers the closest parametric match, sharing the same voltage, current, package, and 500ns recovery time.
The primary risk is substituting with a standard recovery diode (e.g., 1N4007 variants), which will cause excessive switching losses and potential circuit failure.

MSKSEMI
A strong alternative with matching package, voltage, current, and fast recovery time. Requires datasheet review.
| Feature / factor | RS1ML | FR107 F7 | FR107 | US1MW | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SOD-123FL | SOD-123FL | SOD-123FL | SOD-123FL | SOD-123FL — Package matches target.; FR107: Package matches target.; US1MW: Package matches target. |
| Voltage | 1000V | 1000V | 1000V | - | 1000V — Reverse voltage matches.; FR107: Reverse voltage matches. |
| Current | 1.0A | 1.0A | 1.0A | - | 1.0A — Forward current matches.; FR107: Forward current matches. |
| Recovery Time | 500ns | 500ns | ~500ns | 75ns | 500ns / ~500ns / 75ns — Fast recovery time matches target spec.; FR107: Fast recovery time matches target spec.; US1MW: Much faster recovery time (ultra-fast). |
| Forward Voltage | 1.3V | 1.3V | - | 1.7V | 1.3V / 1.7V — Forward voltage matches target.; US1MW: Higher forward voltage will increase power loss. |
Verified drop-in options for RS1ML are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.