
Lelon
A strong functional alternative with identical electrical ratings and a very similar package size.
Finding a substitute for the KNSCHA RVT100UF80V167RV0112 100uF 80V capacitor requires matching its 10x10.5mm SMD package. Several functional alternatives exist, but careful package verification is critical.
Many candidates have different SMD or through-hole packages.
Key parameters like capacitance and voltage are commonly available.
Direct replacement for RVT100UF80V167RV0112 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The Lelon VZH101M1KTR-1010 offers an identical 100uF/80V rating in a very similar 10x10mm package, making it the strongest candidate pending footprint verification.
The primary risk is mechanical incompatibility. Many alternatives have different package sizes that will not fit the original PCB footprint.

Lelon
A strong functional alternative with identical electrical ratings and a very similar package size.
| Feature / factor | RVT100UF80V167RV0112 | VZH101M1KTR-1010 | VEJ101M2ATR-1313 | VZH101M2ATR-1313 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 10mm x 10.5mm | 10mm x 10mm | SMD (12.5x13.5mm est.) | 12.5 mm x 13.5 mm | 10mm x 10mm / SMD (12.5x13.5mm est.) / 12.5 mm x 13.5 mm — Very similar size, slightly shorter. Footprint check needed.; VEJ101M2ATR-1313: Significantly larger, will not fit the same footprint.; VZH101M2ATR-1313: Significantly larger, will not fit the same footprint. |
| Voltage | 80V | 80V | 100V | 100V | 80V / 100V — matched; VEJ101M2ATR-1313: Higher voltage rating is a safe upgrade.; VZH101M2ATR-1313: Higher voltage rating is a safe upgrade. |
| Capacitance | 100µF | 100µF | 100µF | 100µF | 100µF — matched; VEJ101M2ATR-1313: matched; VZH101M2ATR-1313: matched |
| Tolerance | ±20% | ±20% | - | - | ±20% — matched |
Verified drop-in options for RVT100UF80V167RV0112 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.