
ANPEC
A strong functional alternative with higher current and voltage ratings; pinout and external components must be verified.
RY3750 is a 1.2MHz step-up DC-DC converter in a SOT-23-5 package. While no direct drop-in replacement is confirmed, several functional alternatives like the APW7137BI-TRG exist but require careful engineering review of pinout, switching frequency, and current limits.
Different switching frequency affects efficiency and external component values.
All promising candidates share the same SOT-23-5 package.
These are analog regulators, so no firmware changes are expected.
Direct replacement for RY3750 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
APW7137BI-TRG is the most promising candidate, offering higher performance, but requires engineering review of pinout and external components due to different switching frequency.
Electrical parameter differences, especially switching frequency, require recalculating and potentially replacing external components like the inductor and capacitors. Pinout must be verified.

ANPEC
A strong functional alternative with higher current and voltage ratings; pinout and external components must be verified.
| Feature / factor | RY3750 | APW7137BI-TRG | TPS61041DBVR | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SOT-23-5 | SOT-23-5 | SOT-23-5 | SOT-23-5 — Package matches.; TPS61041DBVR: Package matches. | |
| Voltage | 30V | 35V | 28V | 35V / 28V — Higher maximum output voltage.; TPS61041DBVR: Lower maximum output voltage. | |
| Current | 0.6A | 1.3A | 0.25A | 1.3A / 0.25A — Significantly higher switch current limit.; TPS61041DBVR: Significantly lower switch current limit. | |
| Frequency | 1.2MHz | 1MHz | 1MHz | 1MHz — Switching frequency differs, affects external components.; TPS61041DBVR: Switching frequency differs, affects external components. |
Verified drop-in options for RY3750 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.