
LGE
A form-fit alternative with much higher voltage and current ratings; electrical suitability needs review.
The MDD S1B is a standard 1A, 100V general-purpose rectifier in a compact DO-214AC (SMA) package. It is widely used for rectification in power supplies, inverters, and freewheeling applications.
DO-214AC (SMA) is a standard, widely available package.
Verify forward voltage (Vf) and recovery time (Trr) to match application needs.
This is a high-volume, multi-source component type.
Direct replacement for S1B should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Cross-reference to other 'S1' or 'RS1' series rectifiers in SMA packages, like the Bourns CD214A-RS1K.
The main risks involve mismatches in forward voltage (Vf), affecting power efficiency, and reverse recovery time (Trr), which is critical for switching applications.

LGE
A form-fit alternative with much higher voltage and current ratings; electrical suitability needs review.
| Feature / factor | S1B | CD214A-RS1K | S2Y | ES2G | Compatibility / risk |
|---|---|---|---|---|---|
| Package | DO-214AC (SMA) | DO-214AC(SMA) | SMA/DO-214AC | DO-214AC (SMA) | DO-214AC(SMA) / SMA/DO-214AC / DO-214AC (SMA) — Package matches target.; S2Y: Package matches target.; ES2G: Package matches target. |
| Voltage | 100V | 800V | 2000V | 400V | 800V / 2000V / 400V — Higher voltage rating provides more design margin.; S2Y: Significantly higher voltage rating.; ES2G: Higher voltage rating. |
| Current | 1A | 1A | 2A | 2A | 1A / 2A — Current rating matches target.; S2Y: Higher current rating.; ES2G: Higher current rating. |
| Forward Voltage | 1.1V @ 1A | 1.3V @ 1A | - | - | 1.3V @ 1A — Slightly higher Vf may increase power dissipation. |
| Recovery Time | Standard (2µs) | Standard (2µs) | - | Fast Recovery (35ns) | Standard (2µs) / Fast Recovery (35ns) — Standard recovery time matches target type.; ES2G: Much faster than target's standard recovery. |
Verified drop-in options for S1B are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.