
EPSON
A functional alternative with the same package but different load capacitance, requiring circuit modification.
Find replacements for the Seiko SC-32S32.768kHz20PPM7pF 32.768kHz crystal. This guide reviews pin-compatible and functional alternatives, highlighting key differences in load capacitance and ESR.
Most alternatives have different load capacitance (CL) or ESR, requiring circuit validation.
The 3.2x1.5mm 2-SMD package is common, with many form-fit options available.
Direct replacement for SC-32S32.768kHz20PPM7pF should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The Diodes Inc. G8327A043 is the most promising direct replacement. If unavailable, select a functional alternate and adjust external load capacitors.
Load capacitance mismatch is the primary risk, requiring PCB component changes for most alternatives.

EPSON
A functional alternative with the same package but different load capacitance, requiring circuit modification.
| Feature / factor | SC-32S32.768kHz20PPM7pF | G8327A043 | X1A0001410003 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Frequency | 32.768 kHz | 32.768 kHz | 32.768 kHz | 32.768 kHz — Matches target frequency.; X1A0001410003: Matches target frequency. | |
| Load Capacitance | 7 pF | 7 pF | 12.5 pF | 7 pF / 12.5 pF — Matches target load capacitance.; X1A0001410003: Requires changing external capacitors. | |
| Tolerance | ±20 ppm | ±20 ppm | - | ±20 ppm — Matches target frequency tolerance. | |
| Esr | 70 kΩ (max) | 70 kΩ (max) | 50 kΩ (Max) | 70 kΩ (max) / 50 kΩ (Max) — Matches target ESR.; X1A0001410003: Lower ESR is generally better. | |
| Package | 3.2mm x 1.5mm | 3.2mm x 1.5mm | 3.2mm x 1.5mm | 3.2mm x 1.5mm — Matches target package dimensions.; X1A0001410003: Matches target package dimensions. |
Verified drop-in options for SC-32S32.768kHz20PPM7pF are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.