
Sunlord
A strong alternative with matching package, inductance, current ratings, and DCR.
Find replacements for the SMNR5040-330MT, a 33µH, 1.3A SMD power inductor in a 5040 package. Review key parametric differences and package compatibility before selection.
Many alternatives have different footprints, requiring a board redesign.
Several candidates meet or exceed the target's electrical specifications.
Direct replacement for SMNR5040-330MT should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The most direct path is SWPA5040S330MT, which matches the package and key electricals. For new designs, functional alternatives may offer better performance.
The primary risk is selecting a part with a non-matching package, which will not fit on the existing PCB layout.

Sunlord
A strong alternative with matching package, inductance, current ratings, and DCR.
| Feature / factor | SMNR5040-330MT | SWPA5040S330MT | SLO0630H330MTT | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 5040 | 5040 | 6.6x6.4x3.0mm | 5040 / 6.6x6.4x3.0mm — Package size and footprint appear identical.; SLO0630H330MTT: Different footprint requires PCB redesign. | |
| Inductance | 33 µH | 33 µH | 33 µH | 33 µH — Inductance value is identical.; SLO0630H330MTT: Inductance value is identical. | |
| Saturation Current A | 1.3 A | 1.3 A | 3.0 A | 1.3 A / 3.0 A — Saturation current (Isat) is identical.; SLO0630H330MTT: Higher saturation current provides more margin. | |
| Current | 1.2 A | 1.2 A | 2.0 A | 1.2 A / 2.0 A — Heat rating current (Irms) is identical.; SLO0630H330MTT: Higher heat rating current provides more margin. | |
| Dcr Ohm | 0.188 Ω | 0.188 Ω | 0.189 Ω | 0.188 Ω / 0.189 Ω — Typical DC Resistance is identical.; SLO0630H330MTT: Typical DC Resistance is nearly identical. |
Verified drop-in options for SMNR5040-330MT are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.