
FUXINSEMI
A robust upgrade with higher voltage and current in the same package; check forward voltage for efficiency.
The SR560 is a 60V, 5A Schottky rectifier in a DO-201AD package. When seeking a replacement, focus on parts with the same package and equal or greater voltage and current ratings, while carefully checking the forward voltage (Vf) for efficiency.
Higher forward voltage in substitutes can reduce efficiency.
DO-201AD is a standard package with many compatible options.
This is a common type of Schottky diode from multiple vendors.
Direct replacement for SR560 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Upgrade to a higher voltage and/or current part in the same family, like the SR5100 or SR10200.
The primary risk is increased power loss due to a higher forward voltage (Vf) in many alternatives.

FUXINSEMI
A robust upgrade with higher voltage and current in the same package; check forward voltage for efficiency.
| Feature / factor | SR560 | SR10200 | SR5200 | SR5100 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | DO-201AD | DO-201AD | DO-201AD, Axial | DO-201AD | DO-201AD / DO-201AD, Axial — Same axial package.; SR5200: Same axial package.; SR5100: Same axial package. |
| Voltage | 60V | 200V | 200V | 100V | 200V / 100V — Significantly higher voltage rating.; SR5200: Significantly higher voltage rating.; SR5100: Higher voltage provides more design margin. |
| Current | 5A | 10A | 5A | 5A | 10A / 5A — Higher current rating provides more margin.; SR5200: Current rating is identical.; SR5100: Current rating is identical. |
| Forward Voltage | 0.70V @ 5A | 0.95V @ 10A | 0.9V @ 5A | 0.85V @ 5A | 0.95V @ 10A / 0.9V @ 5A / 0.85V @ 5A — Vf at 5A must be checked, but likely higher than target.; SR5200: Higher Vf will increase power loss.; SR5100: Higher Vf may increase power loss. |
Verified drop-in options for SR560 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.