
Yangzhou Yangjie Electronic Technology Co.,Ltd
A pin-compatible upgrade in the same SMAF package with higher voltage (100V) and current (5A) ratings.
The SS36F is a 60V, 3A Schottky diode in a compact, surface-mount SMAF package. When seeking a substitute, prioritize candidates in the same SMAF package to avoid board redesign, while ensuring voltage and current ratings are met or exceeded.
SMAF is a specific flat-lead package; SMA and SMB are common but physically different.
Key parameters like forward voltage (Vf) should be checked as they affect efficiency.
Direct replacement for SS36F should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Start with Datasheet verified or Strong match candidates for SS36F, then review parametric alternatives for package and electrical fit.
Package incompatibility is the main risk. Many alternatives use SMA or SMB packages, which are not footprint-compatible with SMAF and require a board redesign.

Yangzhou Yangjie Electronic Technology Co.,Ltd
A pin-compatible upgrade in the same SMAF package with higher voltage (100V) and current (5A) ratings.
| Feature / factor | SS36F | SL510F | SS310F | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SMAF | SMAF | SMAF | SMAF — Identical package ensures drop-in compatibility.; SS310F: Identical package ensures drop-in compatibility. | |
| Voltage | 60V | 100V | 100V | 100V — Higher voltage rating provides increased design margin.; SS310F: Higher voltage rating provides increased design margin. | |
| Current | 3A | 5A | 3A | 5A / 3A — Higher current rating provides increased design margin.; SS310F: Current rating matches the target. | |
| Vf | 700mV @ 3A | 650mV @ 5A | 850mV@3A | 650mV @ 5A / 850mV@3A — Lower forward voltage improves efficiency. Value from ES data.; SS310F: Higher forward voltage may increase power loss. Value from ES data. |
Verified drop-in options for SS36F are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.