
Yageo
Yageo CC0603JRNPO9BN820 is a potential pin-compatible alternative with matching key electrical specs and package.
Finding a replacement for the CCTC TCC0603COG820J500CT 82pF 50V 0603 capacitor involves matching key electricals and package. Alternatives from major manufacturers like Yageo exist and offer similar performance.
Key parameters match. Secondary parameters like ESR should be checked for sensitive circuits.
Standard 0603 package ensures form and fit compatibility.
Yageo is a major, globally available manufacturer.
Yes, Yageo CC0603JRNPO9BN820 is a potential pin-to-pin replacement for TCC0603COG820J500CT, sharing the same 82pF capacitance, 50V rating, ±5% tolerance, C0G dielectric, and 0603 package.
The most direct path is to use a cross-vendor alternative like Yageo's CC0603JRNPO9BN820, which matches all critical specifications.
The primary risk is subtle electrical differences between manufacturers, such as ESR or termination materials, which may matter in sensitive applications.

Yageo
Yageo CC0603JRNPO9BN820 is a potential pin-compatible alternative with matching key electrical specs and package.
| Feature / factor | TCC0603COG820J500CT | CC0603JRNPO9BN820 | Alt 2 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 0603 (1608 Metric) | 0603 (1608 metric) | 0603 (1608 metric) — Identical package size ensures physical compatibility. | ||
| Capacitance | 82 pF | 82 pF | 82 pF — Capacitance value is identical. | ||
| Voltage | 50 V | 50 V | 50 V — Voltage rating meets the target's specification. | ||
| Tolerance | ±5% | ±5% | ±5% — Tolerance matches the target part. | ||
| Dielectric | COG (NPO) | NP0 (C0G) | NP0 (C0G) — Matching dielectric ensures stable temperature characteristics. | ||
| Temperature | -55°C to +125°C | -55°C to +125°C | -55°C to +125°C — Operating temperature range is identical. |
Verified drop-in options for TCC0603COG820J500CT are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.