
Yageo
An upgrade path from the same manufacturer family with higher surge current and lower capacitance.
Yageo's UBT26A05L03 is an AEC-Q101 qualified 5V TVS diode array in a SOT23-6L package. It is designed to protect four high-speed data lines from ESD and surge events.
Pinout must be verified. Incorrect pinout can cause circuit failure.
Ensure candidate's peak pulse current and power ratings are equal to or greater than the target's.
This is a common component type with many manufacturers, but verify specs for multi-sourced MPNs.
Direct replacement for UBT26A05L03 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The best replacement path is UCT26A05L05-HP1, which is an upgrade with a higher surge current rating (12A vs 5A) and lower capacitance in the same package.
The primary risk when substituting SOT23-6L TVS arrays is pinout incompatibility. While a flow-through configuration is common, other pinouts exist and could damage the protected ICs.

Yageo
An upgrade path from the same manufacturer family with higher surge current and lower capacitance.
| Feature / factor | UBT26A05L03 | UCT26A05L05-HP1 | UDT26A05L05-LC1 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SOT23-6L | SOT23-6L | SOT-23-6L | SOT23-6L / SOT-23-6L — Package matches.; UDT26A05L05-LC1: Package matches. | |
| Voltage | 5V | 5V | 5.0V | 5V / 5.0V — Working voltage matches.; UDT26A05L05-LC1: Working voltage matches. | |
| Current | 5A | 12A | 5.0A | 12A / 5.0A — Higher peak pulse current provides more robustness.; UDT26A05L05-LC1: Peak pulse current matches. | |
| Capacitance | 3.5pF | 1.5pF | 0.8pF | 1.5pF / 0.8pF — Lower capacitance is better for high-speed signals.; UDT26A05L05-LC1: Lower capacitance is better for high-speed signals. | |
| Application | AEC-Q101 | - | AEC-Q101 | AEC-Q101 — Both parts are automotive qualified. |
Verified drop-in options for UBT26A05L03 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.