
Yangzhou Yangjie Electronic Technology Co.,Ltd
ES1K is a strong pin-compatible alternative with identical key electrical ratings, including the critical 75ns recovery time.
US1K is an 800V, 1A ultrafast rectifier in a common SMA package, designed for high-frequency power applications like switch-mode power supplies. Finding a substitute requires matching its critical 75ns reverse recovery time.
Substituting with a slower diode (trr > 100ns) will likely cause circuit failure.
The SMA (DO-214AC) package is very common with many compatible options available.
Ultrafast 800V/1A diodes are a common component type available from numerous vendors.
Direct replacement for US1K should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
ES1K is the best path for a direct replacement. HS2MA is the recommended path for an upgrade with improved current handling.
Using a standard recovery diode (e.g., S1M) instead of an ultrafast one, which will lead to excessive heat and component failure in the intended high-frequency applications.

Yangzhou Yangjie Electronic Technology Co.,Ltd
ES1K is a strong pin-compatible alternative with identical key electrical ratings, including the critical 75ns recovery time.
| Feature / factor | US1K | ES1K | HS2MA | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | SMA (DO-214AC) | SMA (DO-214AC) | SMA (DO-214AC) | SMA (DO-214AC) — Package appears identical, enabling pin compatibility.; HS2MA: Package appears identical, enabling pin compatibility. | |
| Voltage | 800V | 800V | 1000V | 800V / 1000V — Voltage rating is identical.; HS2MA: Higher voltage rating provides more margin. | |
| Current | 1A | 1A | 2A | 1A / 2A — Current rating is identical.; HS2MA: Higher current rating provides more margin. | |
| Recovery Time (Trr) | 75ns | 75ns | 75ns | 75ns — Ultrafast recovery time matches, crucial for function.; HS2MA: Ultrafast recovery time matches, crucial for function. |
Verified drop-in options for US1K are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.