
Nichicon
A strong match with identical electricals, AEC-Q200 qualification, and superior endurance in a nearly identical package.
Find verified substitutes and functional alternatives for the Lelon VEJ101M1HTR-0810, a 100µF 50V 8x10mm SMD aluminum electrolytic capacitor. Key considerations for replacement include package size and AEC-Q200 qualification.
Substitutes may have different diameters or heights, requiring layout verification.
Using a non-AEC-Q200 part in an automotive application is a significant compliance and reliability risk.
Direct replacement for VEJ101M1HTR-0810 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Upgrade to Nichicon UUD1H101MNL1GS for improved endurance, after verifying the 0.5mm height increase is acceptable for your board.
The primary risks are package incompatibility (size mismatch) and loss of AEC-Q200 automotive qualification.

Nichicon
A strong match with identical electricals, AEC-Q200 qualification, and superior endurance in a nearly identical package.
| Feature / factor | VEJ101M1HTR-0810 | UUD1H101MNL1GS | RVT1H101M0810 100UF 50V | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 8x10mm | 8x10.5mm | 8x10.2mm | 8x10.5mm / 8x10.2mm — Candidate is 0.5mm taller; diameter matches. Verify clearance.; RVT1H101M0810 100UF 50V: Excellent fit, only 0.2mm taller. | |
| Voltage | 50V | 50V | 50V | 50V — matched; RVT1H101M0810 100UF 50V: matched | |
| Capacitance | 100µF ±20% | 100µF ±20% | 100µF ±20% | 100µF ±20% — matched; RVT1H101M0810 100UF 50V: matched | |
| Endurance | 2000h @ 105°C | 5000h @ 105°C | - | 5000h @ 105°C — Longer life is a significant improvement. | |
| Aec Q200 | Qualified | Qualified | Not Qualified | Qualified / Not Qualified — matched; RVT1H101M0810 100UF 50V: Target is AEC-Q200 qualified; this is a key downgrade. |
Verified drop-in options for VEJ101M1HTR-0810 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.