
ROQANG
A strong parametric match with a very similar package size; requires verification of PCB land pattern for drop-in compatibility.
Find and compare alternatives for the Lelon VEJ221M1VTR-0810, a 220µF 35V SMD aluminum electrolytic capacitor. This guide provides analysis on functional alternates and potential upgrades, highlighting key differences in package size and electrical ratings.
Many potential substitutes have different diameters or are through-hole, requiring board redesign.
Key parameters (220uF, 35V) are common; secondary parameters like ESR and ripple current should be checked.
Direct replacement for VEJ221M1VTR-0810 should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
Use VT1V221M0810 as a strong functional match, but verify its land pattern from the datasheet. Avoid parts with a 10mm diameter.
Package incompatibility is the main risk. Several alternatives have a larger diameter and will not fit the original 8mm footprint.

ROQANG
A strong parametric match with a very similar package size; requires verification of PCB land pattern for drop-in compatibility.
| Feature / factor | VEJ221M1VTR-0810 | VT1V221M0810 | VZH221M1HTR-1010 | Alt 3 | Compatibility / risk |
|---|---|---|---|---|---|
| Package | 8mm x 10mm | 8mm x 10.2mm | 10mm x 10mm | 8mm x 10.2mm / 10mm x 10mm — Diameter matches, slightly taller. Verify clearance.; VZH221M1HTR-1010: Larger diameter, will not fit original footprint. | |
| Voltage | 35V | 35V | 50V | 35V / 50V — matched; VZH221M1HTR-1010: Higher voltage rating is a safe upgrade. | |
| Capacitance | 220µF | 220µF | 220µF | 220µF — matched; VZH221M1HTR-1010: matched | |
| Endurance | 2000 hours | 2000 hours | - | 2000 hours — matched | |
| Application | Standard | - | AEC-Q200 | AEC-Q200 — Automotive grade, potential upgrade. |
Verified drop-in options for VEJ221M1VTR-0810 are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.