
Likely form-fit compatible, but has a lower voltage rating (100V). Requires engineering review.
ZX-HY2.0-6PZZ is a 6-pin, 2.0mm pitch straight through-hole header. Alternatives exist within the JST PH series, but require careful review of voltage ratings and mechanical dimensions.
Most alternatives have a significantly lower voltage rating (100V vs 250V).
Straight 2.0mm headers are common, but footprint verification is still advised.
JST PH series and clones are widely available from multiple sources.
Direct replacement for ZX-HY2.0-6PZZ should use only Datasheet verified or Strong match candidates; many approved options still require engineering review.
The JST PH series, specifically B6B-PH-K-S(LF)(SN), offers the most viable replacement path due to matching form factor, but requires accepting a lower voltage rating.
Electrical overstress due to lower voltage ratings on common alternatives.

Likely form-fit compatible, but has a lower voltage rating (100V). Requires engineering review.
| Feature / factor | ZX-HY2.0-6PZZ | B6B-PH-K-S(LF)(SN) | PH-6A | S6B-PH-K-S(LF)(SN) | Compatibility / risk |
|---|---|---|---|---|---|
| Pin Count | 6 | 6 | - | - | 6 — Pin count matches. |
| Pitch | 2.0mm | 2.0mm | - | 2.0mm | 2.0mm — Pitch matches.; S6B-PH-K-S(LF)(SN): Pitch matches. |
| Package | Through Hole, Straight | Through Hole, Straight | Through Hole, Straight | Through Hole, Right Angle | Through Hole, Straight / Through Hole, Right Angle — Mounting type and orientation match.; PH-6A: Mounting type and orientation appear to match.; S6B-PH-K-S(LF)(SN): Mounting orientation is different. |
| Voltage | 250V | 100V | 100V | 100V | 100V — Candidate voltage is significantly lower.; PH-6A: Candidate voltage is significantly lower.; S6B-PH-K-S(LF)(SN): Candidate voltage is significantly lower. |
| Current | 2A | 2A | - | - | 2A — Current rating matches. |
| Manufacturer | Megastar | - | HR / CAX | - | HR / CAX — Generic/clone manufacturer. |
Verified drop-in options for ZX-HY2.0-6PZZ are limited in the current batch. Review candidates marked Strong match or Datasheet verified, and validate package, pinout, and electrical limits before committing a BOM change.